First District Court of Appeal upholds EIR for San Francisco’s Housing Element

On August 22, 2018, the First District issued its decision in San Franciscans for Livable Neighborhoods v. City and County of San Francisco (2018) 26 Cal.App.5th 596. The appellate court upheld an EIR that San Francisco prepared for its 2004 and 2009 Housing Elements, notably rejecting a challenge to the use in the EIR of a future-conditions baseline for the plan’s traffic and water supply impacts.

In an earlier appeal involving San Francisco’s 2004 Housing Element, the First District concluded that the City should have prepared an EIR rather than a negative declaration. By the time the trial court issued an amended writ in April 2009 requiring the preparation of an EIR for the 2004 Housing Element, the City was already in the process of preparing its 2009 Housing Element. Consequently, the City combined the environmental review of the two versions and prepared one EIR for both the 2004 and 2009 Housing Elements. After the City adopted the 2009 Housing Element in June 2011, San Franciscans for Livable Neighborhoods (SFLN) filed a new suit and this appeal followed.

For traffic and water supply impacts, the EIR used a baseline of 2025 conditions based on population projections from the Association of Bay Area Governments (ABAG). The court concluded that the City was “within its discretion to adopt a baseline calculation forecasting traffic and water impacts in 2025” rather than “comparing the existing conditions with and without the Housing Element.” Citing POET, LLC v. State Air Resources Board (2017) 12 Cal.App.5th 52 (“POET II”), SFLN argued that the City took an improperly narrow view of the Housing Element and “sidestepped review of the reasonably foreseeable indirect physical changes in the environment.” The court was unpersuaded because the Housing Element consisted of growth-accommodating policies but did not induce or lead to population growth. Discussing the rule described in Neighbors for Smart Rail v. Exposition Metro Line Construction Authority (2013) 57 Cal.4th 439, the court found that substantial evidence supported the City’s determination that an existing-conditions baseline would be misleading as to traffic and water supply impacts. The court also rejected SFLN’s corollary argument about the baseline for land use and visual resources impacts, noting that the EIR did compare the changes in the Housing Element to the existing environment.

Second, the court tackled SFLN’s challenges to the EIR’s analysis of various impacts. It found that substantial evidence supported the EIR’s analysis, explaining that: (1) the EIR reasonably concluded that the 2009 Housing Element would not result in significant impacts on visual resources or neighborhood character because there would be no changes to allowable land uses or building heights, and residential growth would be directed to areas with existing residential uses; (2) the EIR for the Housing Element was not required to study traffic impacts of specific development projects in the pipeline because those projects were proceeding under their own EIRs or CEQA documents; (3) the EIR for the Housing Element was not required to establish a likely source of water and satisfied CEQA by acknowledging the possibility of a post-2030 water supply shortfall during a multiple-dry-year event and discussing the water rationing plan that would balance supply and demand; and (4) the City did not abuse its discretion in determining that the Housing Element was consistent with ABAG’s Land Use Policy Framework because policies would further the goals of the Framework by placing housing near transit and encouraging infill development.

Third, the court turned to SFLN’s argument that the EIR failed to consider feasible reduced-density alternatives. The EIR analyzed three alternatives, including a No Project Alternative, a 2004 Housing Element Alternative, and an Intensified 2009 Housing Element Alternative. The 2004 Housing Element Alternative was identified as the environmentally superior alternative because it would reduce the sole significant and unavoidable impact (cumulative impact on transit) even though it would not reduce the impact to a less than significant level. The court concluded that this was a reasonable range of alternatives. In particular, the court approved of the City’s explanation in responses to comments that the reduced density alternatives suggested by SFLN would not add any meaningful analysis to the EIR because they would not reduce the project’s potential cumulative transit impacts. The court also found that substantial evidence supported the EIR’s conclusion that the SFLN-proposed alternative dubbed the No Additional Rezoning Alternative was infeasible because increasing the density of two major projects within existing neighborhoods as suggested would require rezoning.

Finally, the court rejected SFLN’s argument that the City should have considered additional mitigation measures to reduce transit impacts. The EIR explained that the only way to eliminate the significant transit impacts would be to increase the number of transit vehicles or reduce transit travel time. Since funding for these measures is uncertain and cannot be guaranteed, the EIR deemed them infeasible. Although SFLN suggested two mitigation measures, one was simply a permutation of the No Project Alternative and the other was infeasible because it involved imposing transit impact fees that the City had already decided would be infeasible because they cannot be guaranteed.

Elizabeth Sarine

First District Finds a “Fair Argument” in Comments that a Project’s Height and Density Were Incompatible with a Historic Overlay District and that Traffic Safety and Congestion Issues Could Be Worsened

In Protect Niles v. City of Fremont (2018) 25 Cal.App.5th 1129, the First District Court of Appeal held that the record contained a “fair argument” that a mixed-use project in an historic district might have significant aesthetic impacts on the historic character of the community due to the project’s size and scale. The court also cited residents’ concerns regarding traffic hazards and congestion, and concluded that the city was required to prepare an EIR.

The City of Fremont adopted a zoning overlay district to protect the historic character of the community of Niles, a small commercial strip dating to the 19th century. A developer proposed a mixed-use project with 98 residential units on a vacant six-acre property at the gateway to this district. Neighbors complained that the buildings were too tall, and the project was too dense, so that it was incompatible with the area and would increase traffic congestion. The city’s architectural review board recommended denying the project. The planning commission recommended approval, and the city council adopted a mitigated negative declaration and approved the project. Neighbors sued. The trial court found that the record contained a “fair argument” of potentially significant impacts relating to aesthetics and traffic, and granted the writ. The developer appealed.

In May 2018, the city published a draft EIR for the project. The neighbors moved to dismiss the appeal as moot because the city had decided to comply with the trial court’s writ. The appellate court declined to dismiss the appeal. The city was not a party to the appeal. The developer’s submittal of a revised application did not mean the original project was abandoned. Moreover, the appeal was not moot because, were the developer to prevail, the city’s original approvals would be reinstated regardless of the new application.

Turning to the merits, the court concluded that the project’s visual impact on its setting – in this case, an historic commercial “main street” recognized as sensitive by the city – was a proper subject of review, over and above the analysis of the project’s impact on historic resources. According to the court, the record “clearly” contained a fair argument that the project would have a significant aesthetic impact on the historic district. The city’s initial study found that the project was aesthetically compatible with the district because it reflected the architectural style of the industrial buildings that previously occupied the site, and the city’s design guidelines recognized that architecture within the district was varied. Members of the architecture review board and of the public, however, stated that the project was too tall and dense, and inconsistent with Niles’ village-like character. These complaints continued even after the developer modified the project. The court recognized the “inherently subjective” nature of aesthetic judgments, but found that the comments “were not solely based on vague notions of beauty or personal preference, but were grounded in inconsistencies with the prevailing building heights and architectural styles of the Niles [district] neighborhood and commercial core.” Commenters included members of the city’s historic architectural review board, who recommended denial.

The court rejected the developer’s various arguments that the project’s aesthetic impact was not significant. First, although the site was largely vacant and unkempt, that did not automatically mean that development of the site would be an upgrade. Second, the site, though on the edge of the historic district, was nevertheless located at a recognized gateway to Niles, and was within the district’s boundaries. Third, the architectural review board’s recommendation to deny the project was not a bare conclusion, but was supported by record evidence of the board members’ (whom the court presumed to have historic aesthetic expertise) underlying aesthetic judgments about the effect of the project. Thus, the board’s “collective opinions” on project compatibility with the historic overlay district were substantial evidence supporting a fair argument that the project may have significant aesthetic impacts. Though the court noted that, were the city to prepare an EIR, the city could conclude that the project would not have a significant impact on aesthetics “because aesthetics is an inherently subjective assessment.”

The court also found that the record contained a fair argument concerning traffic safety. The project’s traffic study concluded a left-turn pocket lane was warranted at the project entrance. Staff did not recommend the pocket, however, because left-turn pocket lanes generally were not located elsewhere along the street, and because omitting a pocket would make vehicles slow down. Testimony from residents, however, stated that drivers did not adhere to the posted speed limit, and sight lines might not be adequate if multiple drivers queued up to turn left into the project site. These “fact-based comments” were substantial evidence supporting a fair argument that a new intersection at the project entrance could have significant traffic impacts.

The record also contained a fair argument that the project could contribute to existing traffic congestion. Residents testified that traffic at a nearby intersection was already terrible, and that during the morning commute traffic already backed up from this intersection to the project site. The city’s own traffic study found that traffic at this intersection was Level of Service (“LOS”) E – an unacceptable level of congestion under the city’s standards – and that project-related traffic would cause congestion there to worsen to LOS F. The developer argued that, under the city’s thresholds of significance, a shift from LOS E to LOS F was not a significant impact. The court held, however, that the city’s significance threshold could not be applied to foreclose consideration of substantial evidence that the impact might be significant. The court again found that the “fact-based comments of residents and city staff and officials supported a fair argument that unusual circumstances in Niles might render the thresholds inadequate to capture the impacts of congestion on Niles Boulevard.”