First District orders publication of its discussion of general plan consistency in partially published case

The First District Court of Appeal previously issued a partially published opinion in the case San Francisco Tomorrow v. City and County of San Francisco, Case No. A137753. Those portions of the opinion were discussed in a prior blog post found here.

After the initial partial-publication order, the First District ordered part II of its discussion published, which analyzes whether the project complied with the City’s general plan.

San Francisco Tomorrow, joined by amicus curiae Sierra Club, argued that the trial court improperly deferred to the City’s interpretation of certain “priority policies” contained within the City’s general plan. San Francisco Tomorrow reasoned that the priority policies had been enacted by citizen initiative rather than being authored by the City itself. Therefore, the petitioners urged the appellate court to strictly interpret the requirements of these policies and strike down the City’s findings which determined that the project was “generally compatible” or compatible “on balance” with the priority policies. But the appellate court disagreed, pointing to a host of cases describing the abuse of discretion standard courts apply when reviewing a municipality’s consistency findings. The court determined this standard of review does not change where policies are the result of an initiative adopted by voters, because once an initiative has been approved, it becomes part of the applicable land-use plan. The court declined to apply a strict construction of the individual priority policies and determined that a reasonable person could find that the project was consistent with and furthered various general plan policies.

Fourth District Court of Appeal Holds Homeowners Cannot Challenge Permit Conditions After Agreeing to the Conditions and Completing the Project

The owners of adjacent bluff-top homes applied to the City of Encinitas in 2003 for authorization to replace an erosion control structure and bluff wall, as well as the lower portion of a staircase that gave the owners access to the beach below. The city approved the project but conditioned its approval on the homeowners obtaining a permit from the California Coastal Commission. By the time the Commission considered the permit application, a severe storm had caused the bluff below the homes to collapse. The applicants therefore sought to demolish the remaining erosion control structure, construct a new seawall and bluff protection, and reconstruct the lower stairway. The Commission approved the permit subject to numerous special conditions, including precluding reconstruction of the stairway and limiting the permit’s duration to 20 years. Lynch v. California Coastal Commission (Sept. 9, 2014) 14 C.D.O.S. 10586.

The homeowners challenged the special conditions of the permit. Meanwhile, they signed and recorded the required deed restrictions, satisfied the other prerequisites to permit issuance, obtained the permit, and constructed their project. The Commission argued the owners could no longer proceed with their action because they had agreed to the permit conditions and accepted the benefit of the permit. The trial court found the homeowners had not specifically agreed to nor necessarily accepted the challenged conditions, but the court of appeal disagreed.

The appellate court iterated the maxim that “he who takes the benefit must bear the burden”; i.e., after accepting the benefits of the permit, they could not then challenge aspects of the permit with which they disagreed. The court did not find that the homeowners fit under any exceptions to this general principle. The exception allowing a developer to comply with a condition under protest and proceed with development while simultaneously challenging the condition did not apply to conditions imposed by state agencies or to conditions restricting the manner in which the developer may use its property. The exception for when an agency imposes new conditions on a permit for a later phase of a project already underway did not apply here, as the project did not fit those parameters.

The court did not agree that there should be an “under protest” exception for permit applicants who are opposed to nonfee conditions and desire to build their projects while simultaneously challenging the conditions. The exception would effectively swallow the general rule, as almost all permit applications are submitted by applicants who view the conditions unfavorably. Furthermore, allowing applicants to accept a permit’s benefits while challenging its burdens would foster litigation and create planning uncertainty. Finally, an invalid nonfee condition is not readily quantified or remedied. The court noted that interpretation of deed restrictions is the same as interpretation of contracts, and stated it was “unwilling to condone deliberate subterfuge in recorded documents as doing so would subvert the documents’ noticing function.”

Even if respondents had not waived their right to challenge the permit conditions, the court reasoned, the Commission had lawfully limited the duration of respondents’ permit. The Commission’s findings provided substantial evidence that the seawall would likely need substantial changes within 20 years and would have long-term impacts on adjacent properties. The court found no authority categorically precluding the Commission from imposing a condition limiting the duration of a permit. The court also noted that the reconstruction of the lower stairway required a permit, and therefore must conform to the city’s local coastal program. The court found the reconstruction inconsistent with both general plan policies and coastal bluff overlay regulations, and thus inconsistent with the city’s local coastal program.

Dissent

The dissent argued that the homeowners had not waived their right to challenge the permit conditions, as they had followed all the legal requirements for challenging the conditions and had put the Commission on notice of their objections and intent to challenge them in court.

The dissent concluded that section 30235 of the California Coastal Act precluded the Commission from imposing any condition on the seawall except a condition intended to eliminate or mitigate the seawall’s adverse impacts on the local shoreline sand supply. The majority argued that this position had been rejected in Ocean Harbor House Homeowners Association v. California Coastal Commission. The majority also argued that the conditions were intended to mitigate the project’s adverse long-term impacts.

Finally, the dissent argued that the Commission’s actions violated the Takings clause. The majority argued that until the Commission reached a final decision on future applications for renewals of the seawall, any takings claim was not ripe for adjudication.

Governor Brown Signs Landmark Groundwater Legislation

California’s groundwater will be regulated for the first time under a package of three bills signed by Governor Jerry Brown on September 16, 2014. Together, the bills  establish the “Sustainable Groundwater Management Act” and impose mandates aimed at overseeing and managing California’s groundwater on a sustainable basis into the future. The California Legislature passed the historic legislation on August 29, 2014.

Until now, California was the only state in the nation that did not comprehensively manage and regulate its groundwater. The state could regulate water diverted from reservoirs and above-ground streams, but did not have authority to limit underground pumping prior to the new legislation’s passage and signing by the governor. According to a recent report by the California Water Foundation, groundwater is used to meet 40 percent of the state’s water demands in an average water year. That number can rise to 60 percent or more during droughts such as the one currently gripping the state. A recent study by the California Department of Water Resources revealed that extractions are exceeding replenishment rates in many places, resulting in unsustainable drainage of underground aquifers.

The bill package includes AB 1739 by Assemblymember Roger Dickinson (D-Sacramento), and SB 1168 and SB 1319 by Senator Fran Pavley (D-Agoura Hills). The legislation focuses on local and regional control of groundwater supplies, with eventual direct state intervention if local management falls short. The new act assigns local agencies the authority and responsibility for managing the groundwater basins upon which they rely through various investigative, regulatory, and enforcement tools. “Backstop” provisions allow the State Water Resources Control Board to develop interim plans for basins when local communities fail to prepare or enforce their plans. The legislation expressly states that local agencies and the state must respect all existing rights to surface water and groundwater.

Under the Act, the Department of Water Resources is tasked with ranking groundwater basins as high, medium, low, or very low priority to characterize the seriousness of groundwater problems. Local and regional agencies with “high” or “medium” priority basins that also have critical overdraft conditions must adopt “groundwater sustainability plans” by 2020. Basins ranked high or medium but without critical overdraft conditions must adopt such plans by 2022. In basins ranked as low and very low priority, sustainability plans are optional. “Sustainability” is characterized as the volume of water  that can be pumped without causing long-term problems such as degraded water quality or significant and unreasonable supply depletion. The plans, in limiting groundwater extractions, must also take into consideration economic, social and environmental effects. Sustainability plan approvals are exempt from CEQA.

Senator Pavley’s SB 1168 contains provisions related to local and regional agencies and the creation of sustainability plans. Assemblymember Dickinson’s AB 1739 contains complementary provisions for state intervention where local and regional agencies fail to comply with the new act. Pavley’s SB 1319 amends AB 1739 to place certain limitations on the state’s enforcement authority. The bills were designed to function in tandem, and all three needed to be signed by the governor for the new act to become operative.

To read the bills and related analyses, go to http://www.leginfo.ca.gov/.

The California Water Foundation report can be viewed here.

The DWR study can be viewed here.

 

First District Court of Appeal Holds City May Recover Some Record Preparation Costs Where Petitioner Elected to Prepare the Record

Under Public Resources Code section 21167.6, petitioners may elect to prepare the administrative record in a CEQA proceeding. Petitioners Coalition for Adequate Review and Alliance for Comprehensive Planning chose to prepare the record of proceedings in this case. The court held the City could recover most of its reasonable record preparation costs even though petitioner had elected to prepare the record. Coalition for Adequate Review v. City and County of San Francisco (Sept. 15, 2014) Case No. A135512.

The trial court held on the merits in favor of the City. The City then filed a memorandum of costs, seeking $64,144 for the administrative record, a professional messenger, and service. The City had certified the record in part, claiming it was incomplete due to petitioners’ failure to include statutorily required documents. The City then added these documents to the record. The trial court concluded that because it was the City that had sought to supplement the record, the City should bear that cost. The court further held that petitioners’ discovery requests had not been extraordinary and were not the but-for cause of the City’s costs, and that granting the City’s cost request would chill future petitioner litigation. The appellate court reviewed the issue de novo.

The issue before the court was whether petitioners’ election to prepare the record precluded an award of record preparation costs to the City. The court held that a petitioner’s election to prepare the record does not preclude a public agency from recovering supplemental record preparation costs when incurred to ensure a statutorily complete record. Section 21167.6, subdivision (b)(2) contains no ipso facto prohibition on the recovery of record preparation costs by a public agency. The court stated that in order for an agency to recover costs, circumstances need not be extraordinary, as was the case in St. Vincent’s School for Boys, wherein the city was required at petitioner’s request to locate more than 58,000 pages of documents. A public agency need not put itself at risk of a statutorily incomplete record, the court opined.

The court disagreed that its holding would have a chilling effect on CEQA challenges, as section 21168 expressly provides for the prevailing party to recover costs of record preparation. Furthermore, the parties, and not the public agency, pay the costs, and thus public monies are not used to fund CEQA challenges brought by private parties.

The court then delved into the reasonableness of specific cost items. It disallowed paralegal costs related to the supplemental record where those costs were expended to ensure “completeness” of the record. Public agencies face this chore every time a petitioner elects to prepare the record, and to allow potentially sizeable recoveries for the task would undermine the statutory scheme for controlling the costs of record preparation. The court found that labor costs of assembling the record, production of excerpts of the record, messenger fees, overnight service fees, and the city’s copy of the record prepared by petitioners were all potentially recoverable, and remanded these costs to the trial court for a reasonableness determination. Planning department labor costs to locate documents provided to petitioners, however, were not recoverable here as they “did not approach the egregious abuse the occurred in St. Vincent’s School.”

Fifth District determines city improperly delegated authority under CEQA but affirms city’s characterization of historical status of buildings

The Fifth District Court of Appeal addressed two main issues under CEQA: (1) delegation of a lead agency’s authority, and (2) the standard of review to apply when reviewing an agency’s characterization of a resource as historical or not. (Citizens for the Restoration of L Street v. City of Fresno (Aug. 29, 2014) Case No. F066498.)

The City of Fresno approved infill construction of 28 two-story townhouses on about 1.25 acres of land in the city’s downtown area. Two old houses—constructed in 1906 and 1910—were located on the project site. One house was a designated Heritage Property by the Preservation Commission, and the other house had no historical designation. Both were in a significant state of disrepair and had lost considerable integrity as historical structures. As a result, the Commission determined the homes were not worth preserving; indeed, the homes were offered for sale for one dollar each, and no buyers showed interest. So, as part of the infill project, the city proposed issuing demolition permits for the two structures.

The city prepared an initial study and mitigated negative declaration for the infill project, and issued a notice of intent to adopt the MND in June 2011. The notice did not identify the necessity of development permits or the decisionmaking body approving the demolition, or discuss that the Preservation Commission would have any role in the CEQA review process. The Preservation Commission took the lead in the certification of the MND and determined the two buildings on the project site were not historic. The Commission also certified the MND. Citizens appealed this decision to the City Council, which upheld the Commission’s certification. Citizens filed suit.

The Delegation Issue

On appeal, Citizens renewed its successful argument from below that the Preservation Commission did not have the authority to act as the city’s decisionmaking body for the purpose of certifying the MND. The appellate court turned to the city’s municipal code for guidance to determine if the Commission could be characterized as the decision-making body under CEQA Guidelines § 15356. The court determined that the municipal code did not explicitly grant the Commission the authority to approve the environmental review documents concurrently with the other project-related approvals (though the court noted that the city could adopt such an ordinance expressly granting the Commission this authority).

Due to the structure of the city’s municipal code and the approval process here, the court concluded that the city improperly split responsibility for approval of the project and certification of the environmental review. When this project was on appeal to the city council, the city council was not reviewing the demolition permits or CUPs issued for the project by the Preservation Council. Instead, the city was only reviewing the Commission’s decision to certify the MND. Therefore, the city council was not acting as the final, independent decisionmaking body for the project and the MND, as CEQA requires. The court also found the city’s notice for the public review period of the MND to be inadequate. Finally, the court determined that the city council did not explicitly address and adopt the findings required by CEQA Guidelines section 15074, and Public Resources Code section 21082.1.

The Historic Resource Designation Issue

On the issue of the appropriate standard of review to apply to an agency’s characterization of a building or site as historical or not, the court sided with the city. The court, relying on its prior analysis in Valley Advocates v. City of Fresno (2008) 160 Cal.App.4th 1039, concluded that the substantial evidence standard of review applied. Citizens urged the court to apply the fair argument standard instead.

Citizens suggested that the city’s characterization of the buildings should be reviewed under the fair argument standard because the city adopted a MND, which is reviewed under the fair argument standard. But the court explained that the Legislature adopted a specific section in CEQA (§ 21084.1) addressing historical resources. Final discretionary decisions about whether a building or site is historical are to be made during the early stages of environmental review, and since the Legislature allowed lead agencies to make discretionary decisions regarding the historic significance of resources before preparing CEQA review, application of the fair argument standard in these situations would be contrary to Legislature’s intent. An agency cannot freely exercise discretion when taking action if courts review that action as a matter of law, like under the fair argument standard. For these reasons, the court affirmed the application of the substantial evidence test to the city’s determination that the project would have no impacts on historical resources.

Conclusions and analysis

This case follows other recent cases where courts have faulted lead agencies for splitting approval of project elements, such as CUPs or permits, from certification of the project’s environmental analysis. Interestingly, the Fifth District declined to note that the bifurcated situation in this case was created by Citizens’ failure to appeal both the demolition permits and the MND to the city council. But even though Citizens only appealed the MND, arguably failing to exhaust its administrative remedies on the other issues, the court still held the city responsible for the procedural error in the approval process. This outcome sends a clear warning to lead agencies to be vigilant about ensuring the final, decisionmaking body has the discretionary authority to act on project approvals and the project’s environmental review document. The decision also affirms the Fifth District’s prior analysis in Valley Advocates with regard to agency determinations of whether buildings or sites are historic.

Public notice must occur before a conditional use permit for the placement of telecommunications equipment can be approved by default under California’s Permit Streamlining Act

The controversy in this case arose after the City of San Diego declined to approve conditional use permits (CUPs) for three cell tower facilities operated by American Tower Corporation. The city had previously granted 10-year CUPs for the facilities, and American Tower applied for new CUPs after the originals expired. The city considered the applications and informed American Tower of concerns with the design of the facilities, particularly with regard to aesthetic impacts, but otherwise determined that the applications were exempt from CEQA. The city ultimately denied the CUP applications. American Tower then filed suit in federal district court, raising claims under California’s Permit Streamlining Act. American Tower Corp. v. City of San Diego (Aug. 14, 2014) Case No. 11-56766.

California’s Permit Streamlining Act

Under California’s Permit Streamlining Act, the city was required to act on the CUP applications within 60 days of the city’s exemption determination. The city did not meet this deadline, and American Tower argued that the CUP applications became approved as a matter of law based on the city’s failure to act within 60 days. The district court found this argument compelling, but the Ninth Circuit reached a contrary conclusion.

The Ninth Circuit noted that the Permit Streamlining Act causes a CUP application to become approved by default only if two conditions are met: the lead agency must fail to take action within 60 days and public notice, as required by law, must have occurred. In this case, the appellate court concluded that the required public notice had not occurred, so the CUP applications could not be deemed approved.

To determine whether public notice had occurred prior to the CUP approvals, the appellate court looked to statutory provisions of the San Diego Municipal Code and the constitutional, due process protections articulated by the California Supreme Court in Horn v. County of Ventura. The court determined that the city complied with the notice requirement, so the issue became whether automatic approval of the CUP applications without an opportunity for affected landowners to be heard would “constitute a substantial or significant deprivation of other landowners’ property interests” under the framework established in Horn.

The Ninth Circuit determined that adjacent property owners might be concerned about the visual impacts of the sizable cell towers and hundreds of square feet of adjacent equipment shelters allowed by the CUPs. Therefore, the court had “little trouble” finding that automatic approval of the CUP applications would significantly infringe upon other landowners’ property interests. The City’s notices were silent on the Permit Streamlining Act default approval provision, and American Tower failed to make use of the act’s self-help provisions. Under the act, an applicant may either file an action in court to compel the lead agency to provide public notice and hearing, or the applicant may file its own public notice of the proposed action. So in this case, for example, American Tower could have filed a public notice that the CUP applications would be deemed approved if the city failed to act within 60 days after finding the CUPs exempt from CEQA. But no notice was provided to affected landowners here, so the CUP applications could not be deemed automatically approved under the act.

The Federal Telecommunications Act

American Tower advanced multiple claims under the Federal Telecommunications Act, all of which both the district court and the Ninth Circuit rejected.

Under the Telecommunications Act, a state or local agency must support decisions to deny placement of telecommunications equipment with substantial evidence, measured in the context of applicable state and local law. In this case, the San Diego Municipal code requires that CUP applications comply with, “to the maximum extent feasible,” regulations of the local land development code. American Tower failed to prove that its proposed facilities were designed “to be minimally invasive,” despite being given numerous opportunities by the city’s planning department to submit such evidence. As a result, the court found that the city supported its decision to reject the CUP applications with substantial evidence.

The Ninth Circuit also agreed with the district court that American Tower and the city were not “similarly situated” for the purposes of analyzing whether the city unreasonably discriminated against American Tower. The court noted that while the city maintained telecommunications equipment, this equipment was predominately for public services. Further, the city did not advertise available wireless space, though it did maintain some private leases, so any evidence of competition between the city and American Tower was minimal. In any event, the court found that the alleged discrimination in this case would be reasonable. The Telecommunications Act only prohibits unreasonable discrimination. Since aesthetic concerns are legitimate concerns for a locality, it was not unreasonable for the city to reject the CUP applications based on those concerns.

Finally, the Ninth Circuit held that American Tower did not support a claim under the Telecommunications Act, which mandates that regulation of telecommunications equipment not prohibit the provision of wireless services. An applicant must demonstrate that the manner in which it proposes to fill a significant wireless services gap “is the least intrusive on the values that the denial sought to serve.” Here, the city denied the CUP applications based on aesthetic concerns, and American Tower failed to meet its burden by submitting evidence that the proposed towers and structures were the least intrusive proposals.

Analysis and Conclusion

This opinion applies state law to a common, and sometimes contentious, local land-use planning issue: permitting the placement of telecommunication equipment. The case notes the limits on the power of the Permit Streamlining Act to provide default approval of a permit application, and the court implicitly encourages applicants to make use of the act’s self-help provisions in instances where lead agencies are uncooperative. This case also demonstrates the importance local regulations in the permitting and placement of telecommunications equipment.

First District Upholds Approval of Parkmerced Redevelopment Project in San Francisco

In a partially published opinion, the court upheld San Francisco’s approval of the Parkmerced project, concluding that the San Francisco General Plan contains adequate standards for population density and building intensity, the city did not violate due process rights in approving a development agreement for the project, and the administrative record properly included certain hearing transcripts. The court affirmed the judgment below. San Francisco Tomorrow v. City and County of San Francisco, Case No. A137753.

Parkmerced is an existing 3,221-unit residential complex on 152 acres in southwest San Francisco. The housing is currently divided between 13-story towers and 2-story townhouses. The proposed project is a comprehensive mixed-use redevelopment plan that proposes, over the course of 20 to 30 years, to demolish all the townhouse units, build an equal number of replacement units, and add 5,679 units. The project also envisions providing new commercial and retail services, transit facilities, parks, and open-space amenities, and improving existing utilities and stormwater management systems. The project would also include office space, a new school, daycare facilities, and a fitness center. The Planning Commission certified the final EIR for the project, after which the Board of Supervisors approved the project. San Francisco Tomorrow and Parkmerced Action Coalition filed a petition for writ of mandate. The trial court denied the petition on all counts. Petitioners argued that the San Francisco General Plan’s Urban Design Element is inadequate for failing to include standards for population density and building intensity as required by Government Code section 65302. “Population density,” the court noted, refers to the number of people in a given area rather than the concentration of dwelling units. The court emphasized that the actual layout of a general plan is for the most part within the local agency’s discretion. Here, the section of the Housing Element describing existing housing stock contained a table and map that together provided an adequate description of the population densities for the Parkmerced area. The table and map also projected the likely future densities throughout the city. The court found this adequate. The Urban Design Element was adequate in establishing maximum dimensions of buildings only above specified heights, as this type of standard was contemplated by case law and the general plan. The court afforded the city broad discretion as to the degree that the circulation element correlated with the changes in population density and building intensity.

Petitioners also contended the trial court erred in dismissing Parkmerced Action Coalition’s due process claim. Petitioners argued that as tenants of Parkmerced, members of the coalition held property rights associated with their rent-controlled units, and those rights had been violated by the failure to provide proper notice. The court found no error. The court noted that the only governmental decisions subject to procedural due process principles are decisions that are adjudicative in nature. Legislative action is generally not governed by procedural due process requirements. To conform to this rule, appellants posited that a development agreement is an entitlement, rather than a law of general applicability. While a few cases support the expansion of due process protection where a legislative act exceptionally affects a small number of people, under state law the approval of a development agreement is a legislative act. The court was unwilling to subject the approval to due process requirements simply because it affected property rights in some manner.

Finally, the court held that the trial court had not erred in including in the administrative record transcripts of a set of hearings before a board committee. Though the audio recordings and their transcriptions constituted “other written materials relevant to the agency’s decision on the merits of the project,” no cases held that such documents must be identified in the motion affirming certification of the EIR in order to be “before the decisionmaker.” Furthermore, the hearings occurred before the board’s decision, and thus the recordings and transcripts were properly part of the administrative record. Even if the transcripts were not part of the administrative record, the court held that petitioner had failed to meet their burden of showing such error was prejudicial.

OPR Releases Draft SB 743 CEQA Guidelines for the Evaluation of Transportation Impacts

The Governor’s Office of Planning and Research released a preliminary discussion draft of revisions to the CEQA Guidelines implementing Senate Bill 743 on August 6, 2014. Currently, transportation impacts are typically evaluated based on the delay in traffic flows that vehicles experience at intersections and roadway segments. Delay is measured by the “level of service” or LOS. Mitigation for these impacts often takes the form of traffic improvements focused on increasing roadway capacity such as adding lanes. Recognizing that this practice may actually be counter to public policy by encouraging auto use and emissions, and discouraging alternative forms of transportation, OPR has proposed changes to how transportation impacts are evaluated. Specifically, OPR’s draft revisions to the CEQA Guidelines propose analysis of vehicle miles traveled (VMT), in lieu of LOS, for evaluating transportation impacts.

Most notably, OPR proposes to add Section 15064.3, a new section of the CEQA Guidelines that addresses new methods of measuring transportation impacts. Because Section 15064.3 would be added to Article 5 of the CEQA Guidelines, which relates to the “preliminary review of projects and conduct of initial study,” the new section would apply in the context of negative declarations and EIRs. To conform to the proposed Section 15064.3, OPR has also proposed amendments to the questions in Section XVI, Transportation and Traffic, of Appendix G.

Draft Section 15064.3 includes four subdivisions. Subdivision (a) discusses the purpose of the new section, stating that the primary considerations of a project’s transportation impacts are the amount and distance of vehicle travel associated with a project. Subdivision (a) expressly states that “[a] project’s effect on automobile delay does not constitute a significant environmental impact.” The draft section does not modify CEQA’s general rules regarding the determination of a project’s significant impacts, including the need to consider substantial evidence of a project’s environmental impacts.

Subdivision (b) specifies the criteria for determining the significance of transportation impacts. As stated in subdivision (b), VMT is “generally” the best measurement of transportation impacts, thus allowing agencies room to tailor their analyses to include other measures if appropriate. The draft section describes factors that might indicate whether a project’s VMT is less than significant or not, and gives examples of projects that might have less-than-significant impacts with respect to VMT, such as projects that would result in decreased VMT. Subdivision (b) recognizes that not all transportation projects will induce vehicle travel, such as projects improving transit operations, and thus would not result in a significant transportation impact. In addition to a project’s impact on VMT, “a lead agency may also consider localized effects of project-related transportation on safety.” Finally, subdivision (b) states that a lead agency’s evaluation of a project’s VMT “is subject to a rule of reason,” but also states that “a lead agency generally should not confine its evaluation to its own political boundaries.”

Subdivision (c) refers to proposed amendments in Appendix F, which addresses energy impacts. The proposed amendments to Appendix F acknowledge that VMT may be relevant to the analysis and mitigation of energy impacts. The proposed amendments to Appendix F include examples of mitigation measures and alternatives that may reduce VMT. Examples include improving the jobs/housing balance and improving access to transit. Subdivision (c) clarifies that the proposed revisions in the CEQA Guidelines and Appendix F do not limit an agency’s ability to condition a project pursuant to other laws. For example, agencies may continue to require projects to meet LOS designations set out in applicable general plans or zoning codes. Nor do the proposed revisions prevent an agency from enforcing previously adopted mitigation measures.

Finally, subdivision (d) proposes a phased approach to implementing Section 15064.3. OPR proposes that Section 15064.3 shall apply prospectively to new projects that have not started environmental review. Section 15064.3 shall apply immediately upon the filing of Section 15064.3 with the Secretary of State. After January 1, 2016, Section 15064.3 shall apply statewide.

Under the second part of OPR’s proposed revisions, OPR proposes amendments to Appendix F, which discusses the evaluation of energy impacts under CEQA noted above.

The draft guidelines can be viewed at:

http://opr.ca.gov/docs/Final_Preliminary_Discussion_Draft_of_Updates_Implementing_SB_743_080614.pdf

OPR is requesting that comments be submitted by October 10, 2014.

Supreme Court Reverses Court of Appeal, Holds Legislative Body Need Not Obtain Full CEQA Review Before It Directly Adopts a Voter Initiative

The California Supreme Court held that CEQA review is not a prerequisite to directly adopting a voter initiative under Elections Code section 9214, subdivision (a), when it decided Tuolumne Jobs & Small Business Alliance v. Superior Court (Wal-Mart Stores), Case No. S207173, on August 7, 2014. The Court reversed the Fifth District Court of Appeal’s opinion in Tuolumne Jobs & Small Business Alliance v. Superior Court (2012) (previously reported at 210 Cal.App.4th 1006).

A Wal-Mart store in the City of Sonora sought to expand into a Supercenter. Before the City Council voted on the project, voters circulated the “Wal-Mart Initiative,” which proposed to adopt a specific plan for the contemplated expansion in order to streamline approval of the Supercenter’s construction and operation. The petition was signed by over 20 percent of the City’s registered voters. The City then prepared a report on the initiative examining its consistency with previous approvals for the expansion pursuant to Election Code sections 9212, and 9214, subdivision (c), and adopted the ordinance. The Tuolumne Jobs & Small Business Alliance sued. The Court of Appeal held in favor of the Alliance, expressly disagreeing with the only published authority on point, Native American Sacred Site & Environmental Protection Assn. v. City of Juan Capistrano.

The issue before the Supreme Court was whether a legislative body must obtain full CEQA review before directly adopting a voter initiative under Elections Code section 9214, subdivision (a). Case law has established that CEQA compliance is not required before a legislative body submits an initiative to voters under section 9214, subdivision (b), and the Court held that the result should be the same where the legislative body adopts an ordinance put forth by voters. In reaching this conclusion, the Court noted that the statutory language of section 9214 makes no mention of CEQA. Furthermore, requiring CEQA compliance would effectively nullify the condensed deadlines in the Elections Code, and the abbreviated report provided for in the Code would be superfluous. CEQA would impliedly repeal contrary Elections Code procedures, and the Court emphasized the strong presumption against repeal by implication. The Court also found that application of CEQA to voter initiatives is contrary to Legislative intent, as Legislative history supported the conclusion that CEQA does not apply to any ordinances enacted by initiative, whether through an election or direct adoption.

Finally, the Court noted that direct adoption without CEQA review would not offend public policy. The possibility that interested parties may attempt to use initiatives to advance their own aims, it stated, is part of the democratic process. If direct adoption of an initiative were to result in the enactment of an undesirable law, voters have statutory remedies available to them.