Archives: 2018

Placerville Historic Preservation League v. Judicial Council of California

In Placerville Historic Preservation League v. Judicial Council of California (2017) 16 Cal.App.5th 187, the Court of Appeal for the First Appellate District upheld the San Francisco County Superior Court’s denial of a petition for writ of mandate challenging the Judicial Council of California’s decision to certify a Final EIR and approve a new courthouse in the City of Placerville.

Background

El Dorado County’s court facilities were divided between the Main Street Courthouse, a historic building in downtown Placerville, and the County administrative complex. The Judicial Council proposed to consolidate all court activities in a new three-story building to be built on undeveloped land adjacent to the County jail, less than two miles away from the existing Main Street Courthouse.

In October 2014, the Judicial Council published a draft EIR for the proposed new courthouse. The draft EIR acknowledged that retiring the downtown courthouse could have an impact on downtown Placerville. The EIR also recognized that the Judicial Council was required address neighborhood deterioration as a significant environmental effect under CEQA if urban decay was a reasonably foreseeable impact of the project. The draft EIR defined “urban decay” as “physical deterioration of properties or structures that is so prevalent, substantial, and lasting a significant period of time that it impairs the proper utilization of the properties and structures, and the health, safety, and welfare of the surrounding community.” The draft EIR concluded that urban decay, so defined, was not a reasonably foreseeable consequence of the new courthouse project.

Commenters voiced the concern that closing the historic Main Street Courthouse could negatively affect businesses in downtown Placerville. In response to such concerns, the Judicial Council reiterated the draft EIR’s conclusion that the project was not likely to lead to urban decay. In support of this conclusion, the Judicial Council observed that it was working with both the city and county to develop a re-use strategy for the building that would support the downtown businesses and local residences. The Judicial Council also cited evidence of the City and County’s efforts to find a new use for the historic courthouse building.

Following the Judicial Council’s certification of the final EIR, the Placerville Historic Preservation League (League) filed a petition for writ of mandate, which the trial court denied. The Court of Appeal affirmed.

The Court of Appeal’s Decision

On appeal, the League argued that the Judicial Council erred in concluding that urban decay is not a reasonably foreseeable indirect effect of relocating the courthouse activities from downtown Placerville to their new location. The court held that substantial evidence in the record supported the Judicial Council’s conclusion that the type of physical deterioration contemplated in the term “urban decay” is not reasonably foreseeable. The court explained that there is no presumption that urban decay would result from the project. To the contrary, as defined by CEQA—which focuses on the physical environment—urban decay “is a relatively extreme economic condition.” Evidence in the record, including comments submitted by the public, suggested that downtown Placerville was an economically stable area, and could withstand business closures without falling into urban decay.

The League also characterized the likelihood of the re-use of the historic courthouse building as an “‘unenforceable and illusory”’ commitment. The court explained, however, that the lack of a binding requirement for the re-use of the building does not undermine the EIR’s reasoning. Specifically, the issue before the Judicial Council was whether urban decay was a reasonably foreseeable effect of the project, not whether its occurrence was a certainty. It would be the best interest of the City of Placerville and the County of El Dorado to re-use the historic courthouse building, suggesting that the building was likely to be put to a new use. While the re-use was by no means guaranteed, it was reasonably likely. Therefore, the Judicial Council did not err in relying on the possibility of re-using the building as one basis for concluding that urban decay was not reasonably foreseeable.

The League also argued that the administrative record contained evidence, in the form of comments submitted by local residents and businesses, of the impact of moving the courtroom activities outside of downtown Placerville. The court held that although these letters and comments provided credible grounds to conclude that relocating the courthouse activities would constitute a hardship for some local businesses, it was not substantial evidence to support the conclusion that such economic effects would lead to substantial physical deterioration of the downtown.

The League further argued that the Judicial Council should have prepared an economic study evaluating the effects of removing the courthouse functions from downtown. The court disagreed, noting that in “any endeavor of this type, financial resources are limited, and the lead agency has the discretion to direct resources toward the most pressing concerns.” Just because a financial impact study might have been helpful does not make it necessary.

The Judicial Council was represented by RMM attorneys Andrea Leisy and Laura Harris in the trial court and on appeal.

Friends of the College of San Mateo Gardens v. San Mateo County Community College District II

On remand from the Supreme Court’s holding in Friends of the College of San Mateo Gardens v. San Mateo County Community College (2016) 1 Cal.5th 926 (San Mateo I ), the First District interpreted the Supreme Court’s direction as requiring the application of the fair argument standard of review to claims challenging an addendum to a negative declaration in Friends of the College of San Mateo Gardens v. San Mateo County Community College District (2017) 11 Cal. App.5th 596.

The Supreme Court’s holding in San Mateo I

The San Mateo cases concern the San Mateo County Community College District’s campus renovation project, approved with a mitigated negative declaration (MND) in 2006. In 2011, the college decided to demolish an area of the campus (the Building 20 Complex) that was planned for renovation under the 2006 plan, and construct a parking lot in its place. The updated plan was analyzed in an addendum to the 2006 MND. The suit in San Mateo I followed, with the petitioner alleging that the updated plan was a “new project” under CEQA, and not a modified project subject to CEQA’s subsequent review provisions (Pub. Resources Code, § 21166; CEQA Guidelines, § 15162.). Both the trial court and the First District held that it was a new project, and therefore, the college was not entitled to rely on an addendum.

The Supreme Court reversed, noting first that the proper inquiry under CEQA was not whether or not a project is new or modified, but whether or not the initial environmental document retains informational value in light of the proposed modifications, or if it had become irrelevant.  This is a factual determination to be made by the agency and reviewed for substantial evidence.

If the agency’s decision to proceed under CEQA’s subsequent review provisions is supported by substantial evidence, a court may consider the type of subsequent document prepared by the agency. The standard of review applied by the court in reviewing that decision turns on the nature of the original documents. The agency must first determine if there are substantial changes to the project that require “major revisions” in the original environmental analysis. This determination is reviewed for substantial evidence. When the project was previously reviewed in an EIR, there are no “major revisions” if the initial EIR has already adequately addressed any additional environmental effects expected to result from the proposed modifications. In contrast, when a project is initially approved with a negative declaration, a “major revision” to the negative declaration will necessarily be required if the proposed modification may produce a new or previously unstudied significant environmental effect. If there is no major revision required, the agency can issue a subsequent mitigated negative declaration, addendum, or no further documentation.

Application in San Mateo II

The court applied the two-part test of San Mateo I to the college’s decision to rely on an addendum to the 2006 MND. First, the court conceded that the agency determination—that the MND retained informational value in light of the revised campus plan—was supported by substantial evidence. It retained informational value because the revised plan considered in the addendum did not affect plans to demolish 14 of the buildings cited in the original plan. The revised plan added one more building complex to the demolition list, but the college had previously removed two others, deciding to renovate them instead. The mitigation measures adopted with the original plan remained in place.

Applying the second prong of the Supreme Court’s test, however, the court held that the college violated CEQA’s subsequent review provisions by preparing an addendum to the MND, because the removal of gardens in the Building 20 Complex could result in a significant aesthetic impact, under the fair argument standard of review.

Interpreting this second prong of the San Mateo I test, the San Mateo II court stated that when the initial environmental review document is an negative declaration, the court must apply the more exacting standard applicable to negative declarations—whether there is substantial evidence to support a fair argument that the proposed changes to the project might have a significant effect on the environment. The court acknowledged that aesthetic impacts are necessarily subjective, but agreed with the petitioner that substantial evidence of a fair argument could be found in lay opinions based on direct observation. The impact is not determined by the size of the area, but measured in light of the context in which it occurs, and this can vary by setting.

Here, the court relied on the opinions of campus employees and students regarding the garden’s aesthetic value and quality. Although not a significant portion of the campus’ open space (less than one-third of one percent), the garden’s vegetation and landscaping were alleged by its admirers to be unique. The garden’s social value as a gathering space was also considered. Because the court determined that these opinions qualified as substantial evidence to support a fair argument of a potentially significant aesthetic impact, the college’s decision to rely on an addendum violated CEQA’s subsequent review provisions, as an addendum is only appropriate if there are no new or more severe significant impacts than were previously analyzed.  However, the court refused to order the preparation of an EIR, stating that the college could choose to prepare a subsequent MND if the impacts to the garden could be mitigated to a less-than-significant level.

RMM Partner Sabrina V. Teller represented the respondent college district.

Second District Finds for Respondents on All Counts, Upholding EIR for “Iconic Gateway” Project in West Hollywood

In Los Angeles Conservancy v. City of West Hollywood (2017) ­18 Cal.App.5th 1031, the Second Appellate District upheld the trial court’s denial of a petition for writ of mandate, finding that the EIR’s treatment of alternatives was sufficient and that the city adequately responded to comments.

In 2014, the city certified an EIR for a mixed–use development in the Melrose Triangle section of West Hollywood. The project was the product of city incentives to redevelop the area in order to create a unified site design with open space, pedestrian access, and an iconic “gateway” building to welcome visitors and promote economic development. The EIR concluded that a significant and unavoidable impact would result from the demolition of a building eligible for listing as a California historic resource.

One alternative would have preserved the building in its entirety, by reducing and redesigning the project. The preservation alternative was ultimately rejected as infeasible because it was inconsistent with project objectives, and would eliminate or disrupt the project’s critical design elements.

After circulating the draft EIR, the project’s architects developed a site design which incorporated the building’s façade and mandated this design as a condition of approval. Furthermore, a subsequent fire destroyed 25 percent of the building, but left the façade intact. The final EIR and conditions were approved in 2014. Petitioners immediately filed suit.

In the court below, petitioner argued that the EIR’s analysis of the preservation alternative was inadequate, the city did not respond to public comments, and that the city’s finding that the alternative was infeasible was not supported by substantial evidence. The respondents prevailed on all claims and petitioner appealed.

Finding for respondents, the court reiterated the Laurel Heights standard that an analysis of alternatives does not require perfection, only that the EIR provide sufficient information to support a reasonable range of alternatives. The court rejected petitioner’s contention that the EIR was required to include a conceptual drawing of the preservation alternative. Furthermore, the EIR’s statement that preservation of the building would preclude construction of other parts of the project was self-explanatory and did not require additional analysis. The EIR’s use of estimates to calculate how the preservation alternative would reduce the project’s footprint did not create ambiguities that would confuse the public. Such imprecision is simply inherent in the use of estimates.

The court also found that the city’s responses to the three comments cited by the petitioner were made in good faith and demonstrated reasoned analysis.  The court reiterated that a response is not insufficient when it cross-references relevant sections of the draft EIR, and that the level of detail required in a response can vary. Here, the West Hollywood Preservation Alliance and the President of the Art Deco Society of Los Angeles opined in comments that the building could be preserved while achieving the project’s objectives. The city adequately responded to these comments by referencing, and expanding upon, the EIR’s analysis of the preservation alternative, where this option was considered. The last comment was of a general nature, so the city’s brief, general response was appropriate.

Finally, the court found sufficient evidence to support the city’s finding that the preservation alternative was infeasible. An alternative is infeasible when it cannot meet project objectives or when policy considerations render it impractical or undesirable. An agency’s determination of infeasibility is presumed correct and entitled to deference, if supported by substantial evidence in the record. The court found that the city’s conclusion that the alternative is infeasible was supported by substantial evidence in the record. Development plans, photographs, and testimony from senior planning staff support the city’s conclusion that retaining the building and reducing the project would not fulfill the project objectives of creating a unified site design, promoting pedestrian uses, and encouraging regional economic development.  That another conclusion could have be reached did not render the city’s decision flawed.

A consistent theme underlying the court’s decision was the city’s clear goal of revitalizing the entire site, in order to create a functional and attractive gateway for West Hollywood. Critical to the project’s success was removing the specific building that the petitioner sought to preserve. The court appeared reluctant to overcome such a strong mandate by flyspecking the EIR’s analysis of this acknowledged significant impact.